Proel Engineering Srl on the behalf of Vestas Blades: work is progressing at the Taranto plant
Proel Engineering Srl continues its work within the plant of Vestas Taranto, taking a central role in the construction of infrastructure necessary for the production of the V236 wind turbine, the largest ever built in the world.
The core of the project: BLA 4 warehouse
The main focus is on structural and functional adaptation and extension of the BLA 4 warehouse, identified as the focus of V236 production.
The extraordinary dimensions of this wind turbine, the largest ever built, require the implementation of highly complex engineering solutions.
It is against this background that Proel Engineering Srl is focusing its efforts on upgrading existing infrastructures, with interventions aimed at ensuring the capacity to support exceptional loads and oversize dimensions, while meeting the highest standards of safety and operational functionality.
Supplementary measures
In addition to the work on BLA 4, Proel Engineering Srl is carrying out a series of complementary work on other warehouses of plant, including:
- the updating of the plant to conform to the most advanced safety technologies;
- functional rearrangement of spaces to improve internal logistics and ensure more efficient management of operational flows.
A technological impact beyond borders
Proel Engineering Srl’s involvement in a project of this scope highlights the company’s role as technical reference partner for complex interventions in the industrial sector. Proel’s engineering know-how and its capacity in terms of manhours translate into the ability to tackle the most advanced technical challenges, contributing to putting Taranto as a strategic hub in the renewable energy sector.